14 November 2026; this guide does not replace a current product-specific import and tariff review.
The speed printed in a brochure is not enough to select a packaging line. The equipment must suit your product, container, premises and utilities, while every component needs a traceable transport plan. Establish import eligibility, contract scope and installation responsibility before ordering.
Test with your actual product
Agree a factory acceptance test using representative product and packaging samples. Define container-size range, fill weight, film or closure type, seal quality and changeover requirements. Ask for rated output together with test conditions and limitations. A demonstration video is not proof of performance on your material. Put acceptance criteria, defect correction and responsibilities into the purchase agreement.
Define what a complete line includes
Create an identifiable schedule covering the main machine, conveyors, controls, tooling, sensors, initial spares and software. Match electricity, compressed air, water or cooling needs and installation dimensions to the destination factory. Clarify software licences, support access, training and technician travel. Arranging freight does not automatically include installation or commissioning.
Assess classification and eligibility of the system
HS heading 8422 includes specified filling, closing and packing functions; this does not automatically classify every component of a production line there. Composite-machine and functional-unit rules require specialist assessment. Check the Iranian eight-digit codes, new or used status, approvals and conformity requirements for the actual file. No live Iranian trade-system check or permission for a particular line is provided in this article.

Make dismantling traceable
Photograph connections and preserve assembly drawings before dismantling. Identify cables, pipes and modules so each package maps to the contractual component schedule. Protect displays and sensors and provide appropriate supports and engineered restraint for heavy units. Final packing photographs, dimensions, weights and a package-level contents list help receiving and reassembly teams reconcile what arrived.
One shipment or phased delivery?
Sending the main machine early may not accelerate commissioning if a missing panel or tool stops the entire line. Align arrival sequence with the installation plan. Review the documentation and cost implications of split shipments with the responsible customs adviser before dispatch. Loading and unloading plans must account for available equipment and factory access. The CTU Code offers general packing and securing guidance rather than a cargo-specific engineering design.
Budget through to commissioning
Separate equipment cost, testing, dismantling, packing, cranes, freight, agreed insurance, storage, import clearance, installation and training. An unprepared destination site can create storage costs even when transport is on schedule. Duty and timing depend on the actual equipment and current requirements; do not apply one standard percentage to every production line.
Frequently asked questions
Does a complete line always have one tariff code?
No. Function, components and applicable classification rules must be assessed.
What is needed for a freight quote?
Proforma and component list, packing plan, dimensions and gross weights per package, loading and delivery sites and handling equipment.
Does freight include installation?
Only where installation and responsibilities are expressly included in the agreed service scope.
Submit the component schedule and packing specifications through the quick cargo-registration portal or quotation form for transport planning.
Related guides
Related Iran–Türkiye guide (Persian)
Related Iran–Türkiye guide (Persian)
Sources and review date
Türkiye Ministry of Trade: Iran import and exchange rules
Related cargo guides
Buying and shipping industrial machinery from Türkiye to Iran
Buying and shipping machinery spare parts from Türkiye to Iran
Buying and shipping industrial electrical equipment from Türkiye to Iran











